
Welcome to the Mike Scott Recordings - Solo and More Page.
This Page contains a round-up of Mike's earlier pre-Waterboys output. Also included are all of his Solo releases, memorabilia and various other pieces, and lastly, his numerous guest appearances on other Artists' singles and albums.
Thank you to Mike Scott, Ali Wilson, Iain Thow, Chris Coleman, Simon Pope, Flattop, Andy Darlington, Dave Furneaux, Dag Reinert Johansen, Peter Vallance, Jack Vervoort, Harry Schetts, Takako Saito, Andy Pritchatt, Glenn Gibson, Michael Pickard, Laurie Evans and Rose MacKinnon for contributing items to this web page.
* If you have a piece of memorabilia that is not included here, please send a photo on and it shall be added. *
Mike writes: "Patreon is a way for us to share with fans the music that might not make it onto the records: jams, demos, strange songs, experiments. We also have a lot of great live recordings that have never been made public. We'll be posting these too. I also have ideas for video content and other stuff. It's gonna be a lot of fun."
An ever-growing hoard of unreleased gems, stories and great chat await within! To join please
Click Here - The
Waterboys - Patreon Page
This extensive Page is split into six main sections for quick and easy access.
.....**Click on the Heading Title below to go to that section** .....
Before he formed The Waterboys in the autumn of 1982, Mike had released several singles (and a cassette) with Another Pretty Face, one DNV single and one single (in two formats) with Funhouse respectively. All of these early releases are documented below.
Mike released two solo albums in the 1990s and both of these spawned numerous single releases and various promo items. These solo releases and more are all documented here on this page.
Vinyl and CD Releases, promos and memorabilia surrounding the Bring 'Em All In album.
Releases, promos and memorabilia surrounding the Still Burning album.
Mike also made numerous appearances on other Artists' singles and albums. Many of these releases are documented in the 'Guest Appearances' section located further down this page. This single was issued under the band name DNV. It contains three songs and released in September 1979. The first two songs were culled from a one day recording session by The Bootlegs on September 4th 1978 at Taybank Studios in Ayr. This is a rather special copy of the DNV single, with the scarce inner printed sleeve, that is shown here. Mike has anotated the front cover with Patti Smith 'Easter' lyrics, made a note on the back of sleeve and
he has also written a line from Death in Venice on the record label. On the inside of the poster sleeve are the handwritten verses to Heaven Gets Closer Everyday albeit with more profound lyrics and he has signed it 'MS 79'. After the demise of The Bootlegs, Mike and John Caldwell formed Another Pretty Face who were very active from 1978 to 1981. The band name was inspired by a line from the book 'The Boy Looked at Johnny: The Obituary of Rock and Roll'
by Julie Burchill and Tony Parsons. They were a hardworking band and built up a good fanbase across Scotland and in London on the live circuit. Photo: Kingdom Come - Edinburgh Music Fanzine - May 1979. Mike writes: 'This photo of APF with me in striped t-shirt under jacket is our first gig at Chambers Street Students
Union, Edinburgh in March 1979. The cat with the leather jacket looking upwards is Jim Geddes the bass player. Crigg is the
drummer and John Caldwell the other guitarist. I don't remember who took the photo. Jim, Crigg and John were all from Ayr.
Crigg is also the drummer in The Bootlegs (aka DNV so he is on Death In Venice).' Eyewitness accounts (Thank you Iain and Ali) say the APF gigs were wild fantastic affairs and the band had a real power on stage. During the years 1978 to 1981 the band went through numerous lineup changes and they released four individual singles plus one cassette.
These historic photos were taken by Rose MacKinnon at the first-ever concert by Another Pretty Face which took place in Edinburgh. Rose: 'My photos were only snaps with a very cheap camera, I’m amazed any survived. It was in the basement of the Student Union. A small, dark venue, with a tiny stage area barely separating the band and the crowd. We were very excited to be at APF's first gig and we were not disappointed! Lots of raw energy with signs, and sounds, of the big music to come.' Mike recalls: 'The gig, yes I remember it. Chambers St Student Union, down the stairs, March 8th or 9th 1979. We opened the gig with Pipeline, the old surfing instrumental which we'd learned from the version on Johnny Thunders' "So Alone" album'. Thank you Rose MacKinnon and Mike. A very scarce A5 sized LIMITEDITION Fan magazine from Ayer, dated August 1979 with Another Pretty Face on the cover and an article and interview within. Thank you Chris. Another Pretty Face in January 1980. Photo: Virginia Turbett. L to R: Willie Kirkwood (bass), Mike, Steve 'Chik'
McLaughlin (drums) and John Caldwell (guitar). Thank you Ali, Iain and Chris. Another Pretty Face rare gig poster, designed by Laurie Evans, for a show in The Astoria, Edinburgh on 30th June 1980. Laurie did a
number of photo shoots with the band in 1979 and 1980. You can check out her work here: Laurie Evans Photo Archive - Instagram.
and here: Laurie Evans Photography -
Facebook.
☄ Another Pretty Face ☄
All you need to know.
☄ Another Pretty Face: The Singles ☄
A round up of all their vinyl singles.
☄ Another Pretty Face - Rare Cassettes ☄
Demo and live cassettes and the five variations of the APF cassette release which contains studio and live recordings.
☄ Funhouse ☄
Some memorabilia and a single by this short-lived band.
☄ The Red And The Black ☄
A number of concert posters by this proto-Waterboys band.
☄ Solo Years ☄
☄ Bring 'Em All In ☄
☄ Bring 'Em All In - Single ☄
☄ Building the City of Light ☄
☄ Still Burning ☄
☄ Love Anyway ☄
☄ Rare, Precious and Gone ☄
☄ Guest Appearances ☄
☄ Early Single Releases ☄
☄ DNV - Mafia - 1979 ☄

The Bootlegs were Mike: guitar & vocals, Norman Rodger: bass & vocals, Allan McConnell: guitar and Ian Walter Greig (Crigg): drums. They only played two gigs (second gig ticket shown) before they split and Mike and John Caldwell then formed APF.






☄ Another Pretty Face ☄

☄ Another Pretty Face - First Show Photo Collage ☄

☄ Limitedition - Ayr Fan Magazine 1979 ☄

☄ Another Pretty Face - Virgin Promo Photo + Two APF Badges ☄

☄ Another Pretty Face - The Astoria, Edinburgh 1980 ☄

Thank you Laurie.

Another Pretty Face scarce gig poster for a show in Aquarius, Grindlay Street, Edinburgh on 4th September 1980.
Thank you Rose MacKinnon.
Thank you Chris.


A rare APF button badge measuring 38mm approx. with what is almost certainly a Virginia Turbett band photo image. This badge was most likely sold at gigs.
Thank you Paul Sheehan.
A rare original handmade A4 sized APF gig flyer. Thank you Simon.
Also pictured on right, a scarce gig poster for the 'Hope 'N' Anchor' and single promo.


Only 1000 copies of All The Boys Love Carrie on a green label and with a green foldout poster sleeve were pressed and released on the New Pleasures record label in May 1979.
The striking design for the sleeve was influenced by an 1950's album cover 'Cha Cha Cha Vol.1' by Pedro Garcia And His Del Prado Orchestra. This limited press single is a rare item now and commands a high price.





The All The Boys love Carrie poster sleeve features a fold out photo of the band taken at the Scott Monument on Princes Street Gardens, Edinburgh.
Photo taken by Pete McDonough.
All The Boys Love Carrie on a green label with a green foldout poster sleeve and with extremely rare inner sleeve.

All The Boys Love Carrie Green cover signed by John Caldwell and Mike.

There were 5000 copies of All The Boys Love Carrie released on a red label and in a standard style red sleeve on the New Pleasures record label. This is a vintage signed copy.




Two press adverts for the new APF single on Virgin Records from the NME music magazine.


A second Virgin promotional photo. Shot in January 1980 by Virginia Turbett. This one is not seen very often.
Thank you Michael.
The second single by APF, Whatever Happened To The West? / Goodbye 1970's in a standard style sleeve and a Virgin Press Release.



A vintage signed copy of Whatever Happened To The West? single with 'Goodbye Virgin' signed on the reverse. Thank you Flattop.


Another signed cover of the Whatever Happened To The West? single.

The third single by APF, Heaven Gets Closer Every Day / Only Heroes Live Forever in a foldout poster sleeve which was issued on the Chicken Jazz record label. The inner sleeve on this copy has APF contact details handwritten by Mike.




The Heaven Gets Closer Everyday poster sleeve features a fold out photo on a stylized background with lyrics to Only Heroes live Forever on the inside.

An early Another Pretty Face Information Sheet dating from Spring 1980. This Info Sheet was made by Mike to give away at gigs and to sent off to different people and fans. Thank you Michael.
Two scarce Another Pretty Face A4 size Information Sheet booklets dating from late 1980 and early 1981 consist of four pages each, both of which are packed with APF info. These are Issues Nos. 1 and 2. Both were made by Mike and posted off to about forty people, on average, every week; as well as being distributed at gigs. Needless to say, both of these Info Sheet issues are nigh on impossible to find these days. Thank you Michael.

The final single by APF, Soul To Soul was an E.P. containing three songs. It came in a foldout poster sleeve which was issued on the Chicken Jazz record label. This is a vintage signed copy that is shown here. Thank you Dave.





The Soul To Soul poster sleeve features a fold out photo with cut and paste handwritten lyrics on a black background to God On The Screen and the third track A Woman's Place.
The Noise! The Jazz!
An extremely rare APF studio demos cassette with a personal note from Mike. Thank you Glenn.

Another APF demo cassette with a handwritten tracklisting by Mike. Thank you Glenn.

A live compilation 1979 -1980 cassette, compiled by Mike, with a handwritten tracklisting by Mike. Thank you Michael.

A Greatest Hits live cassette with a handwritten tracklisting by Mike. Thank you Michael.

Because APF had not played a gig in about eight weeks, Mike wanted to play a low key gig in preparation for their upcoming October tour. So they played in the Fountain Inn, Barnton, Edinburgh on 6th September 1980, a gig which was not advertised, under the band name 'New Pleasures'. They performed a mostly new set in front of about sixty people and the gig was fantastic! This is a tape of the show made by Mike with a few extra APF tracks added by him. Thank you Michael.

This very rare and wonderfully crafted set numbers 'about 500'. The Minizine booklet was designed and put together by John Caldwell and Mike. John also did the cover illustration and all of the tape labels were cut out by hand and attached to each individual cassette by Mike.
The cassette itself contains eight songs, both live and studio recordings, as well as a miniature booklet (Minizine). It was released in February 1981 and sold at APF gigs. There are five cover variations, with five different colours, coming in Pink, Blue, Yellow, Green and Beige sleeves. Each tape has different splash markings which makes each and every one a unique piece of art. This cassette is a very scarce item to find these days and usually commands a high price.
Thank You Mike for the background information on the creation of this little gem.
* Tracks A1, A2 and B4 recorded live at Ayr Pavilion on October 1st 1980.
** Tracks A3 and A4 live at Cumbernauld Theatre on October 6th 1980.
*** Tracks B1, B2 and B3 recorded in February / March 1980 at Brittania Row Studios, London.
Pink sleeve edition with a pink minizine and it contains a beige coloured tape. Thank you Ali.

Blue edition with the extremely rare 16-page Fanzine. This version is housed in a blue sleeve and contains a pink coloured tape. Thank you Dag.

Yellow sleeve edition with a yellow minizine coming with a green coloured tape.

Green sleeve edition with a green minizine coming with a green coloured tape. Thank you Glenn.

Another Pretty Face appeared on the cover of Sounds magazine on the December 2nd 1979 issue, which featured a two page spread within. Also included is the Scottish Kultchur compilation LP which features APF: All the Boys Love Carrie.


The rarely seen song lyric 'Kick It Over' that Mike submitted to Ludds Mill Fanzine issue no. 16/17 and which was published in January 1981 by Andy Darlington.
Thank you Andy.
A scarce A4 Funhouse Info Sheet from December 1981. Thank you Michael.

Funhouse featuring Mike and John Caldwell played a grand total of five gigs in the early part of 1982. The sets were were made up of APF songs and several (as then) unreleased Waterboys songs. Funhouse did release one single on 7-inch and 12-inch. A 7-inch of this single was also released in Australia.
Thank you Chris.


A very rare Funhouse show poster (The Ghost of Another Pretty Face) advertising a four gig residency from January and February 1982. The band only played five concerts in total.
Thank you Andy Pritchatt.
The first and only single Out of Control contains two songs. It came in a standard colour sleeve which was issued on the Ensign record label.




The 12-inch single contains Out of Control (Full Version) which is a longer version than the 7-inch. And the B-side is It Must Be Hell. Like the 7-inch it came in a standard colour sleeve and was issued on the Ensign record label.




This is the Australian release of Out of Control. It came in a standard generic sleeve and was again issued on the Ensign record label.


The Red And The Black were a proto-Waterboys band formed by Mike after Anthony came on board in early spring 1982. Kevin Wilkinson would also join the band in June.
Although they did not release any singles, they played a grand total of nine gigs in and around London from April to July 1982 and built up a loyal audience.
Apart from some Another Pretty Face songs and a few covers, the spine of the set was made up of songs that would appear on The Waterboys self-titled debut album the following year and the A Pagan Place record two years later in 1984. Apparently, and unsurprisingly 'Red Army Blues', which received its public debut at a show in The Embassy Club on the 10th May 1982, was a real audience favourite.
A lovely original The Red And The Black show advert advertising a show in the Hope and Anchor, Islington on July 15th 1982.
Thank you Mike.

An original The Red And The Black show poster advertising two gigs from May 1982.
Mike writes: "The art is by John Caldwell, copied from a photo, possibly of Bill Wyman".

Another original The Red And The Black gig poster from May / June 1982. The poster states 'Records to come soon on Ensign'. Thank you Michael.

Another original The Red And The Black gig poster from July 1982.

You can check out each and every one of these individual setlists from 1982 (and a lot more), on the official Mike Scott and The Waterboys site...mikescottwaterboys/archive/setlists/1982
Complete collection of all seven Waves magazines and exclusive poster.

Limited to only 250 copies the Sunflowers contains demo versions of some songs from the Dream Harder album, including a number of cuts and different versions that did not make the record release. Originally only available to members of The Waterboys Information Society this very scarce CD now commands a sky-high price. This album release is an essential must-have!


Limited to only 250 copies the Lion of Love is a gem of an album. It contains demo versions of some songs from Bring 'Em all In, including a couple that did not make the album, as well as three songs from radio sessions recorded on the album tour. Originally only available to members of the Mike Scott Information Society this rare CD now commands a very high price. Again this album is an essential acquisition!


A film soundtrack promo CD for the Norwegian film 'Die Mjuke Hendene' (The Soft Hands) from 1998. This film soundtrack album was only issued in very small numbers as a promotional CD and was not on general sale. It features three Mike solo songs: 'Bring 'Em All In', 'She Is So Beautiful' and 'What Do You Want Me To Do?'. It also features one Waterboys song: 'Strange Boat'. A rare thing.


One of the rarest of all Waterboys CDs and perhaps the hardest one of all to find, this compilation 'Open To Spirit: The Transformational Music of Mike Scott and The Waterboys' album was released in very limited numbers in 2002.
The CD booklet contains a 'Shadow Dancer' photograph by Mike and it also contains the song lyrics.
This collection is a very unique combination of both Mike's solo songs and Waterboys material. The song selection was compiled by Janette.
Mike writes: 'This was a promotional CD created in 2002 and manufactured in small quantities for our American new age publicist of the time to distribute to new age / holistic / spiritual publications and radio stations.'
This album is a real jewel in any Waterboys collection!


The Sound of Cloud album was a limited edition release of 5000 copies when it was issued in 2012, with each copy numbered and signed by the man himself. (Copy shown also signed by Steve).
It features many studio recordings made between 2002-2012, and four live songs culled from a handful of shows between 2000 and 2009 including a wild 'Savage Earth Heart' from the (then) recently relaunched band at the Glastonbury Festival 2000.A good many of these songs have appeared on the Mick Puck Soundcloud page but none of these song titles appear on any other Waterboys release to date. Absolutely essential!

A two-night stand poster from Findhorn in June 1994.
Thank you Peter.


The first solo album by Mike Bring 'Em All In was released in the UK and Europe 0n September 18th 1995. Many of the songs were already familar to those who attended his solo shows from 1994 onwards.
Bring 'Em All In was recorded in Findhorn where Mike road-tested the songs over his numerous appearances in Universal Hall before taking them to a worldwide audience. Mike's solo tour, from 1994 and 1996, took in many performances around the world with tours of Europe, the USA and Japan.
A Bring 'Em All In Press Release with promo photos.

A signed promo photo from 1995 taken by Jill Furmanovsky.





A Bring 'Em All In 'Pan' T-Shirt from 1995.


A signed solo show poster from the Paradiso, Amsterdam on 9th February 1995.
Thank you Harry.
A 'Flying Solo' T-Shirt from 1995 with a beautiful golden back print.

Two signed copies of the album shown.


A UK Promo CD with release date.


A Bring 'Em All In USA album press release and photo.

A US Advance Listening album CD for promotion only.




Thank you Dag.

Thank you Dag.





Press listing for UK tour in October 1995.
A scarce promotional VHS video tape of Bring 'Em All In in a plain sleeve.






All of the CD singles released from the Bring 'Em All In album release contain non-album tracks and are well worth seeking out.
A Bring 'Em All In press release, promo CD and photo.

Four-track Bring 'Em All In single.


Five-track E.P. of Bring 'Em All In from the USA.


A Promo Five-track E.P. of Bring 'Em All In from the US.


A five-track promo Bring 'Em All In Album Preview E.P.



A one-track Promo of Bring 'Em All In from the USA.


A 12 x 12 inch Promo Display Flat intended for the single's promotion in record shops.

A scarce VHS video tape of the Building The City of Light promo with UK tour dates on the back of a full colour sleeve. This video was directed by Mike and David Anderson.





A Building the City of Light press release, promo CD and photo.

CD 1 of Building The City of Light.


CD 2 of Building The City of Light.


A Promo Five-track E.P. of Building The City of Light from the US.


A one-track promo of Building The City of Light in a white title sleeve.



A Japanese Tour flyer from January 1996.
Thank you Takako.
A pair of album and tour promotional postcards from 1995 and 1997.


An announcement from Mike dating from January 1st 1997, talking about the new and as yet untitled album and his plans for the year ahead.
Thank you Dag.
Still Burning was recorded at Olympic Studios in London with some heavyweight musicians drafted in for the recording sessions. These included Pino Palladino on bass, Chris Bruce on lead, Ian McNabb and Jim Keltner on drums. The Still Burning album was released on September 29th 1997 and it was very well received.
The resulting tour was an absolute triumph as anyone who was lucky enough to see a show, will testify. The touring band consisted of James Hallawell, Geoff Dugmore, Ian McNabb and the late Gavin 'Fingers' Ralston.
Still Burning standard CD album with ten songs.


An Advance Listening CD simply named Mike Scott for promotion.


Released in the USA with a whopping fourteen songs, this is the version to seek out. This is a promo version.


Press advert for the Still Burning autumn tour in the UK.

Scarce UK 24-page and 22-page European Tour Itineraries given to the band and crew, listing travel, hotel and venue details along with soundcheck and stage times. Both are A5 size.

Original Tour Laminate for the band and crew only and a VIP Laminate from the opening night of the five-night stand at The Garage, London in August 1997.

A nicely printed concert ticket and two backstage passes from the European Tour in 1997.

A four track one-sided Still Burning promo tape.


A polo shirt from the Still Burning Tour in 1997. The polo shirt features some embroidery on the chest along with the album title on the left sleeve.

A concert poster from the Stavanger show in Norway on the Still Burning tour.
Thank you Dag.



A Japanese Tour poster listing the Still Burning shows from November 1997.
Released in Japan (and Canada) with twelve songs, Mike bookended the Still Burning album with tours in January 1996 and again in November 1997.


A scarce sample promo CD of the Still Burning album with promo tag and Sample printed on disc.


A very scarce ten-page A5 size Japanese Tour Itinerary booklet given to the band and crew, listing travel, hotel, venue details, sound check and stage times with a personal note from Mike.

Again all of the CD singles released from the Still Burning CD album contain several non-album tracks and are well worth seeking out. The cassette single of Love Anyway contains an exclusive song King of Stars which is not on any other format.
A 12 x 12 inch Promo Display Flat intended for the single's promotion in record shops.

This is a rare promotional video containing all four video clips of Mike's single releases from his two solo albums: Bring 'Em All In, Building the City of Light, Love Anyway, and Rare, Precious and Gone and also The Whole of the Moon video clip. Thank you Dag.

This cassette single has an exclusive song 'King of Stars' which is only available on this tape.

CD 1 of Love Anyway.


CD 2 of Love Anyway.


A four-track Love Anyway released in Europe.


A two-track promo of Love Anyway.


A scarce 12 x 12 inch Promo Display Flat intended for the single's promotion in record shops.

A hard to come by promo postcard for the Rare, Precious and Gone single with some details on the reverse. Thank you Michael.


A difficult to find promotional video for Rare, Precious and Gone. Thank you Dag.

A signed flyer for the forthcoming Rare, Precious and Gone single with an application form for the Mike Scott Information Society on the reverse.


CD 1 of Rare, Precious and Gone.


CD 2 of Rare, Precious and Gone.


A 7-track mini-album Promo of Rare, Precious and Gone containing all the songs from the two-part CD singles set. Well worth seeking out.


A promo one-track CD of Rare, Precious and Gone in a card sleeve.


A USA promo one-track CD of Questions with a back sleeve.


Over the years Mike has made numerous guest appearances on other Artists' singles and albums, under his own name or using the Waterboys moniker. He has also written a number songs for other artists. Listed below is a comprehensive selection of these releases.
Are all of his guest appearances listed here? Most probably not.
If you happen to have something not shown below, please send a photo on and it shall be added. Many Thanks.
This TV21 single E.P. released on the band's own Powbeat label, features Mike on piano on Ticking Away. TV21 were formed by Norman Rodger who is an old friend of Mike since his days in Ayr. TV21 also supported Another Pretty Face on many concert dates.
Norman also played bass on It Should Have Been You which is included on The Waterboys debut self-titled LP, and also on the US/Canada 'mini' LP.
Shown here is the TV21 'Ambition' E.P. in a fold-out sleeve, a four page band bio and a signed letter from Norman to prospective record labels.


The Last Chant single the Run of the Dove which was released on the Chicken Jazz label was produced by Mike and he also plays piano and sings backing vocals on the A-side.


What A Nice Way To Turn Seventeen was a series of LP records or 7-inch E.P's that were released from 1983 to 1986, which featured local bands and solo artists. This 7-inch E.P. contains a song by Rag Dolls titled Sparrows which features Mike on piano.


The LP Bible Belt was released in 1983 with a vinyl reissue in 2014. It features Mike on acoustic guitar, electric guitar, piano and backing vocals on three songs Chelsea Embankment, The Road Of Broken Dreams and The Only Boy In Heaven. Anto and Kevin Wilkinson also feature on most of the other songs.


This Limited Edition green vinyl 7-inch of Chelsea Embankment was released in 2017 by the Easy Action record label. It features Mike on piano.


This album contains a song by Mike and Nikki Sudden titled Mister Fox. Also of interest here is another song written by Anto Thistlethwaite titled Siberian Mines, performed by The Wild Things with Anto and Kevin Wilkinson on the drums.





This version of the very hard-to-find double A-side single of Down By The Sally Gardens b/w Blean Na Bó (Hey Rock N Roll) is notable for the misspelling of Bó. The number that were pressed with this error is not known.
Released in 1989, it features all of the (then) Waterboys: Mike, Anto, Steve, Trevor, Noel Bridgeman, Colin Blakey and John Dunford. Liam O'Maonlái also appears on backing vocals. This single was also produced by Mike. If you happen to come across one of these, do not hesitate.




This is the Tomás single with the correct spelling on a slightly different label. The number of this corrected version that were
pressed is not known. Both versions of the single were pressed in the Carlton Productions Record Plant in Dublin, notable by the Double
Dip at centre of label and the gripper teeth surrounding the label rim. Both of these identifying characteristics are unique to
the Irish Record Plant.
This Saw Doctors iconic single N17 which was released on the Solid Records label was produced by Mike and he also sings backing vocals on the title track. Anto Thistlethwaite also features here on saxophone on the N17. The Trip to Tipp is the b-side of Hay Wrap and it is a co-write by Mike with Leo Moran and Davey Carton from the Saw Doctors. A promo 55-minute interview and music with Dave Fanning (Irish DJ) from 1991. Also available as a double-disc digipak with the 'Best Of'compilation.

☄ The Saw Doctors - N17 - 1990 ☄


☄ The Saw Doctors - The Trip to Tipp - 1991 ☄


☄ The Mike Scott Interview - 1991 ☄


Ode To A Black Man - Remembering Philip P. Lynott is a concept album of sorts. It originally appeared on cassette in Ireland in 1989 and it was subsequently released on CD in 1991. It features Mike singing a verse on the last track 'Epilogue' and the album also features Vinnie Kilduff.


The 2-CD soundtrack album from the excellent BBC series of the same name, with a host of Irish and international artists contains the wonderful 'A Song For The Life.' by The Waterboys. The second single CD is a U.S. release from 1999 which also includes 'A Song For The Life.'


A promo interview/music excerpt CD. A great companion piece to the Dream Harder release and the elusive Sunflowers album.


The Seasons Wheels is co-written by Mike with the Hothouse Flowers and appears as the second track on the An Emotional Time single from 1993. The Japanese 3-inch CD is shown here.

A benefit album for Victoria Williams, this CD features many artists including Lou Reed, Lucinda Williams, Giant Sand and many others covering Victoria's songs. The Waterboys perform the heavily reggae infused 'Why Look At The Moon.'


Pal Shazar was a founding member of the New Wave band Slow Children in the early 80's. Pal is also an accomplished painter and she painted the wonderful cover for the Dream Harder LP.This is the second solo album by the US Singer/Songwriter.
It features Mike sharing vocals with her on the song 'Penny For Your Thoughts'.


This Jackie Leven The Mystery of Love is Greater than the Mystery of Death album from 1994 features Mike, Anto and James Hallawell. Mike shares vocals on the spoken word 15th century poem 'Clay Jug' written by Kabir.


This is a BBC transcription CD of the full performance of Ian McNabb and Crazy Horse at Glastonnbury 1994 and features Mike guesting for two songs: 'Glastonbury Song' and 'Preparing to Fly'.
Thank you Flattop.


Released by Ian through his own website in circa 2010 Live Like A Rock is the full Glastonbury 1994 performance with Crazy Horse and Mike joining them for two songs 'Glastonbury Song' and 'Preparing to Fly'.
Thank you Flattop.


A compilation with many Artists commemorating 25 years of the Glastonbury Festival. It features Mike with a studio version of 'Goin' Back To Glasters' which differs from the live version that appears on CD1 of the 'Building The City Of Light' single. This song is not available elsewhere.



This compilation is from 1995 and it features a collaboration of Jackie Leven, Robert Bly and Mike on the song 'Clay Jug'.
This album is long since deleted but it is worth seeking out for this song.
This is a 7-inch by folkrock blues band 'Wire Train', who were based in San Francisco. Mike, Steve and Anto all feature on the song 'Compassion'. The CD of 'Last Perfect Thing - A Retrospective' album is long since deleted and it commands a strong price whenever it appears for sale.


This is another 2-CD compilation to celebrate 100 years of EMI Records.
It contains a fabulous Mike cover of the Kate Bush song 'Why Should I Love You?'.
Mike quote (abridged)..."This song was the soundtrack to six tumultuous months in my life...It's a song to fall in or out of love to, and terrific music for cooking stir-fry!"
This album is now deleted but it is relatively easy to find at a reasonable price.


This album from 1997 is a real musical treat for Waterboys fans. Apart from fabulous interpretations by a plethora of other Artists (including Van, Shane and even Mr Yeats himself!), it contains 'Song Of The Rosey Cross' by Mike Scott and Sharon Shannon and also 'The Stolen Child' by The Waterboys and Tomas MacEoin and this is a remix.
It also contains 'Politics' by Karl Wallinger, and 'The Four Ages of Man' by World Party.
Essential? Yes, most definitely!



This excellent compilation CD from 1998 features a varied selection of Mike's solo work as well several Waterboys songs. It is the only release that features this selection of solo and band work to date. This copy is signed by Mike and Karl.

This compilation album from 1998 contains the rare and hard to find song 'Clay Jug'.
Released in 1998 this Ian McNabb acoustic-based 'A Party Political Broadcast On Behalf Of The Emotional Party' album features Mike on guitar and backing vocals on two songs, firstly 'Loveless Age' and secondly, 'You Only Get What You Deserve' with Anto on mandolin. Anto also features on sax and mandolin on two other songs. The album was reissued in 2001.


This is a limited promo CD release, housed in a vinyl album-sized gatefold sleeve, celebrating 21 years since the release of The Rolling Stones classic album Beggars Banquet. It features a wide array of musicians playing covers of each of the songs on the Stones record.
It contains 'Salt Of The Earth' by Ian McNabb with Mike Scott and Anto Thistlethwaite.
However, this album is quite scarce as it was limited to only 500 copies.

This album was recorded between 1989 and 1991 but it was not released until 1999. During this time Sharon became a Watergirl herself and toured with the band.
The guest list that features on this album would choke a Shire horse!
Mike, Steve, Anto, Trevor and Noel Bridgeman all feature as does Eoin O'Neill, Liam O Maonlai, Donal Lunny, Philip King, Adam Clayton and many more.


This is a song from 'Os Amores Libres', an album by Carlos Nunez. A fine version of Raggle Taggle Gypsy with Mike. This is the promo 2 track CD that is shown here.



This Celebrating the Life and Works of Kevin Wilkinson 2CD compilation is from 2000 and all proceeds go to the Kevin Wilkinson Trust, set up on behalf of Kevin's children. Kevin was a member of the Waterboys from 1982 - 1985.
The band appear on this 2-CD set with 'Sleek White Schooner'.
Thank you Harry.
This is a promo two-track CD of 'On My Way To The Big Light' recorded by Mielaw and Mike, featuring and the original full version and a radio edit.


This double CD is a collection of on site radio sessions recorded throughout 2001. The album features a variety of artists such as Willie Nelson, Lucinda Williams, Billy Bragg and many more.
What is of special interest to us here, is an exclusive live in the studio recording of 'Bring em all in' featuring both Mike and Steve which was recorded on September 25th 2001. This version is exclusive to this album and is unavailable elsewhere. So this is an album that is well worth tracking down.


This is a compilation CD given away free with the Uncut Magazine in January 2002. (Vol 1 was also available separately). It also contains the elusive 'Salt Of The Earth' by Ian McNabb with Mike and Anto. It is not too difficult to find, if you do not have it already.


Another benefit album, this time a 2-CD collection of music and poetry in aid of the Aran Lifeboats.
The first CD contains the Waterboys song 'Woman Of Ireland' and the second CD contains a live instrumental of 'The Silver Spear/The High Reel' by Sean Watty Flaherty & Mairtin Flaherty with Mike & Vinnie Kilduff.



This album, released in August 2006, features two songs written by Mike: 'We Built a Monster' and 'Whistle and Steam' although he does not appear on the album himself.
This album is also notable for the appearance of ex-Watergirl Jo Wadeson on bass and Waterboy James Hallawell on hammond organ.
An Irish CD release of an album containing all songs in the Irish language which includes The Waterboys with the all Irish version of Peace of Iona: 'Siochain Iona'. This version later appeared on the (now long-since sold out) signed, numbered and limited 'Cloud of Sound' CD album in 2012.


Another wonderful song with a great vocal by Mike. 'In The Beginning Was Love' was released as a single by One People in Norway in 2007. This is the two-track promo single that is shown here.


L'espoir is the fourth album by French Singer/Songwriter Cali and it was his first #1 album in France. It features Mike Scott on two songs, 'Pas La Guerre' and also 'List Of Lies'. This is the Limited Edition version with a DVD that is shown here.



This album is a 'Best Of' album from Sharon Shannon that is basically a collection of duets with various musical guests.
It contains 'Song Of The Rosey Cross' with Mike.
This 2-track CD was released in 2008 with all profits going to the Strange Boat Donation Foundation which was set up by Martina and Denis Goggin following a family bereavement.
It features Mike, Eddi Reader, Sharon Shannon, (the late) Alec Finn and Charlie Lennon.You can read more about the Strange Boat Foundation Here.

Great Things is a 2009 album from long time friend of the band, Ian McNabb and it features Mike on the song 'New Light'.


This 2-track promo CD featuring Sharon Shannon with Mike, Anto and Steve was released in 2009. It features an edit and a remix of Saints and Angels and it was also produced by Mike.
Thank you Sharon.

A 'Live at the World Cafe' Album that features the Waterboys performing the song 'She Tried to Hold Me'. This track is exclusive to this release and not available elsewhere.


Another compilation from Sharon that features Mike on two songs. Firstly he sings vocals the song 'Song of the Rosey Cross' and secondly he appears on the song 'Munster Hop'. This latter song is unavailable elsewhere.


Another excellent album from Sharon Shannon, and this CD contains two songs of interest to the Waterboys fan.
First up is 'Saints and Angels' then the lively instrumental 'Hillbilly Lilly and Buffalo Benji', both featuring The Waterboys.



This album by Sarah Calderwood was released in 2011.
It contains a very powerful song called 'The Blue Cockade' with a really great vocal by Mike.
A fantastic triple CD collection of live performances from the long running and legendary OGWT TV show.
Also included here on CD2 is a live version of 'This is the Sea' from The Waterboys.
This Live version was originally broadcast on November 19th 1985.



A four LP compilation album with an exclusive Waterboys song. This compilation, with liner notes by David Lynch, also features a host of artists such as Tom Waits, Iggy Pop and many more.
It contains a version of 'In the Beginning was Love' that is different to the Mike and One People 2007 release.

A triple CD compilation released in 2013. Very notable for the inclusion of the song 'Whatever Happened To The West' by Another Pretty Face.
One of the few APF songs to appear officially in CD form thus far.
This album contains 'Savage Earth Heart' by the Waterboys. This version is live from Glastonbury 2000.
Although it is the same version that appeared on the limited edition and signed album Cloud of Sound in 2012, this album is long since sold out.


Another wonderful song with a great vocal by Mike. 'Changing of the Guard' was released as a duet with Blankass on a promo compilation.
Mike reworked the lyrics from this song for 'In My Time on Earth' from the Where The Action Is album.



This album was released by Thea Gilmore in May of 2015.
And it features The Waterboys on the song 'Glistening Bay'.
This is a charity album for Focus Ireland, and it was launched at a Benefit Gig in Dublin on April 24th 2016.
It contains a fantastic rendition of 'The Wild Mountain Time' (intentional spelling by Mike) by the Waterboys, which was recorded at Puck Towers.
This song is exclusive to this release and is not available elsewhere.

